Building Making
SITE: Trombay public school, Mumbai


Looking at the dead spaces and threshhold spaces throughout the site

Concept and conceptual Model






Playing with plinths and openings
In between spaces
Working with the boundries



Design Develpment and Detailing

![sectionsss [Converted]_page-0001 (1).jpg](https://static.wixstatic.com/media/0c88d6_f33a4fa937034f01a92665ac9453c639~mv2.jpg/v1/crop/x_3,y_342,w_1751,h_420/fill/w_1115,h_268,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/sectionsss%20%5BConverted%5D_page-0001%20(1).jpg)
Construction Management and Planning
GENERAL NOTES :
-
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.
-
ALL THE WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
-
DRAWINGS TO BE SEEN WITH RESPECT TO ALL OTHER DRAWINGS.
-
P.C.C. IS IN THE RATIO OF 1:3:6 (CEMENT: SAND COARSE AGGREGATE).
-
ALL LEVELS ARE SPECIFIED IN METERS.
-
ALL DECISIONS REINFORCEMENT CALCULATIONS NEED TO BE TAKEN BY STRUCTURAL ENGINEER.
-
DO NOT SCALE THE DRAWING.
-
ALL DISCREPANCIES SHALL BE BROUGHT TO NOTICE TO THE ARCHITECT BEFORE THE COMMENCEMENT OF ANY WORK.
-
RICHER CONCRETE MIX TO BE USED FOR THE FOUNDATION AND M:30 MIX TO BE USED FOR THE SUPER STRUCTURE, ALL MIXES SHALL BE SUGGESTED, EXAMINED AND APPROVED BY THE STRUCTURAL ENGINEER.
-
VERIFY FIELD CONDITIONS AND COORDINATION WITH THE PROJECT DOCUMENTS PRIOR TO PROCEEDING WITH THE WORK.
-
WORK WITHIN THE FIELD BOUNDARIES AS SPECIFIED IN THE PROJECT DOCUMENT AND COMPLY WITH ALL THE APPUCABLE BUILDING CODES, REGULATIONS AND ORDINANCE REQUIREMENTS.
-
OCCUPANTS ON THE ADJACENCIES TO THE PROJECT AREA SHALL CONTINUE UNINTERRUPTED/UNDISTURBED OCCUPANCY DURING THE CONSTRUCTION OF THE PROJECT











