top of page

Building Making

SITE: Trombay public school, Mumbai 
SECTION n.jpg
Incremental school model 2018fe.jpg

Looking at the dead spaces and threshhold spaces throughout the site

​

IMG-3539.jpg
Concept and conceptual Model
IMG-3543.jpg
IMG-3499.jpg
IMG-3500.jpg
IMG-3498.jpg
IMG-3497.jpg
IMG-3542.jpg

Playing with plinths and openings

​

In between spaces

​

Working with the boundries

​

​

​

IMG-3562.jpg
IMG-3561.jpg
Design Develpment and Detailing
Nisha's Plan_page-0001.jpg
sectionsss [Converted]_page-0001 (1).jpg
Construction Management and Planning

GENERAL NOTES :

 

  • ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.

  • ALL THE WRITTEN DIMENSIONS ARE TO BE FOLLOWED.

  • DRAWINGS TO BE SEEN WITH RESPECT TO ALL OTHER DRAWINGS.

  • P.C.C. IS IN THE RATIO OF 1:3:6 (CEMENT: SAND COARSE AGGREGATE).

  • ALL LEVELS ARE SPECIFIED IN METERS.

  • ALL DECISIONS REINFORCEMENT CALCULATIONS NEED TO BE TAKEN BY STRUCTURAL ENGINEER.

  • DO NOT SCALE THE DRAWING.

  • ALL DISCREPANCIES SHALL BE BROUGHT TO NOTICE TO THE ARCHITECT BEFORE THE COMMENCEMENT OF ANY WORK.

  • RICHER CONCRETE MIX TO BE USED FOR THE FOUNDATION AND M:30 MIX TO BE USED FOR THE SUPER STRUCTURE, ALL MIXES SHALL BE SUGGESTED, EXAMINED AND APPROVED BY THE STRUCTURAL ENGINEER.

  • VERIFY FIELD CONDITIONS AND COORDINATION WITH THE PROJECT DOCUMENTS PRIOR TO PROCEEDING WITH THE WORK.

  • WORK WITHIN THE FIELD BOUNDARIES AS SPECIFIED IN THE PROJECT DOCUMENT AND COMPLY WITH ALL THE APPUCABLE BUILDING CODES, REGULATIONS AND ORDINANCE REQUIREMENTS.

  • OCCUPANTS ON THE ADJACENCIES TO THE PROJECT AREA SHALL CONTINUE UNINTERRUPTED/UNDISTURBED OCCUPANCY DURING THE CONSTRUCTION OF THE PROJECT

20-6.jpg
20-5.jpg
20-4.jpg
20-3.jpg
20-7.jpg
20-13.jpg
20-14.jpg
20-2.jpg
20-8.jpg
20-9.jpg
20-11.jpg
20-10.jpg
bottom of page